The system runs on a cluster of eight two CPU 246 Opterons, running on SuSE Enterprise Linux 8 and each dual machine having 6GB of memory apiece.
This also indicates that IBM is likely to ship DB2 for Opteron earlier than expected - availability date is the 8th of November 2003 according to the TPC report.
The eight nodes cluster includes 5831.06GB of storage. Here's a snap of the IBM results: µ
Here's the PDF L'INQ. And here's something we captured earlier. µ